United States · New York civil procedure
When must Commercial Division parties arrange expert disclosure?
Rule 13(c) requires consultation at least 30 days before fact discovery ends, and completion of expert disclosure within four months afterward.
- Period
- Variable or combined statutory windows
- Trigger
- Established fact-discovery completion date and the actual expert schedule
- Rule
- 22 NYCRR 202.70(g), Rule 13(c)
Current official court provision retained as a bounded extract. Reviewed. A revision label is not an inferred effective date.
Source guide · No automated date
When must Commercial Division parties arrange expert disclosure?
The procedure contains a backward consultation cutoff, a forward four-month completion boundary and individual scheduled report and deposition dates. The one-date preset cannot represent the complete schedule.
22 NYCRR 202.70(g), Rule 13(c)What lawyers say
5.0“The platform is really easy to use.”
Michael B.Employment litigation attorney · California
“The Evidence Record saved us time with our insurance on bankruptcy matters.”
MariaBankruptcy and commercial attorney · London, UK
“The most up-to-date service we could find.”
Li ChenArbitration practitioner · Singapore
Which event starts the 22 NYCRR 202.70(g), Rule 13(c) requirement?
Identify the fact-discovery completion date in the actual schedule.
Confer on expert identification, reports and depositions no later than thirty days before that date. Record the agreed schedule or objection.
Responsible actor. The parties intending trial expert testimony and the court resolving objections. Rule 13(c) expert scheduling, consultation and completion. These are separate procedural events.
22 NYCRR 202.70(g), Rule 13(c)Which separate windows or schedule must be established?
- Identify the fact-discovery completion date in the actual schedule.
- Confer on expert identification, reports and depositions no later than thirty days before that date. Record the agreed schedule or objection.
- Exclude the established event day and count every intermediate calendar day under GCL 20.
- Complete expert identification, report exchange and testifying-expert depositions within four months after fact discovery ends. Seek a court conference on objections.
The procedure contains a backward consultation cutoff, a forward four-month completion boundary and individual scheduled report and deposition dates. The one-date preset cannot represent the complete schedule.
22 NYCRR 202.70(g), Rule 13(c)Why does one date not resolve this requirement?
Fictitious comparison. Parties sharing one fact-discovery completion date may agree on different report exchanges, while retaining the same consultation cutoff and outside completion boundary.
The procedure contains a backward consultation cutoff, a forward four-month completion boundary and individual scheduled report and deposition dates. The one-date preset cannot represent the complete schedule.
Which facts change this requirement?
- Two sides of the same anchor
- Consultation precedes fact-discovery completion. Expert disclosure completion follows it by up to four calendar months.
- Reports
- Check Rule 13(c)’s required report contents and the actual expert identification and deposition schedule.
- Readiness and late disclosure
- Expert disclosure must be completed before the note of issue and readiness certificate. Late disclosure without good cause can preclude the expert.
- Combined procedure or actual schedule
- The procedure contains a backward consultation cutoff, a forward four-month completion boundary and individual scheduled report and deposition dates. The one-date preset cannot represent the complete schedule.
- Rule 13(c) expert scheduling, consultation and completion. These are separate procedural events.
- The procedure contains a backward consultation cutoff, a forward four-month completion boundary and individual scheduled report and deposition dates. The one-date preset cannot represent the complete schedule.
Which completed acts and evidence should be retained?
Questions about 22 NYCRR 202.70(g), Rule 13(c)
When must Commercial Division parties arrange expert disclosure?
Is thirty days the expert report deadline?
No. Thirty days concerns consultation before fact discovery ends. The agreed or court-set report date is a different event.
22 NYCRR 202.70(g), Rule 13(c)Does four months mean 120 days?
No. GCL 30 counts calendar months and handles shorter final months.
General Construction Law 30Can I file the readiness certificate before expert disclosure ends?
Rule 13(c) requires completion of expert disclosure before the note of issue and certificate.
22 NYCRR 202.70(g), Rule 13(c)Official procedural, counting and completion sources
Provisions used (10)
| Provision | Purpose |
|---|---|
| 22 NYCRR 202.70(g), Rule 13(c) | The particular actor, event, period and required act |
| General Construction Law 30 | Corresponding month day and shorter-month end |
| 22 NYCRR 202.5-b(d), (f), (h), (i) | Branch-specific service or filing completion |
| CPLR 2103, party-paper service and specified method additions | Branch-specific service or filing completion |
| General Construction Law 20, event-day exclusion | Event-day exclusion |
| General Construction Law 30, corresponding calendar month | Corresponding month day and shorter-month end |
| General Construction Law 58, statutory year | Statutory year and leap-year treatment |
| General Construction Law 24, public holidays | Statutory public holidays |
| General Construction Law 25-a, closed final day | Closed final statutory day |
| Election Law 8-100(1)(c), general election day | General election day |